Filters
    More filters
    Tamil Nadu
    Showing 6350 to 6375 of 7,644 results.
    Tamil Nadu Newsprint And Papers Limited
    XX 20XX
    Tamil Nadu - Karur
    Refer doc
    0

    Transformer Oil Filtration Work In Pulpmill Areas During Annual Shutdown At Pulp - Electrical In Tnpl Unit - I

    Tamil Nadu Newsprint And Papers Limited
    XX 20XX
    Tamil Nadu - Karur
    Refer doc
    0

    Crown Cleaning - Per Tree For Tewlis Area In Srp-electrical Tnpl Unit-i

    Indian Oil Corporation Limited
    XX 20XX
    Tamil Nadu - Chennai
    Refer doc
    0

    Corrigendum : Manufacturing, Procurement Of Materials, Testing At Manufacturers Works, Inspection By Tpia, Packing, Supply Of Spectacle Blinds

    MUNICIPAL CORPORATION
    XX 20XX
    Tamil Nadu - Madurai
    Refer doc
    47XXXX

    Corrigendum : Public Tap Platform Arrangements In Various Places 21 Nos In Ward No 57

    Tamil Nadu Medical Services Corporation Limited
    XX 20XX
    Tamil Nadu - Chennai
    Refer doc
    0

    Online Tender For Supply And Installation Of High End Color Doppler System To Dept. Of Radiology, Institute Of Child Health And Hospital For Children, Chennai

    CORPORATION OF CHENNAI
    XX 20XX
    Tamil Nadu - Chennai
    Refer doc
    78XXXXX

    Corrigendum : E.l.d.c.no/smii/p10/2792/ 2025 Hiring Of Manpower 21 Nos Of Electrician And 39 Nos Of Electrical Helper For The Operation Of Sump And Pumps In Zone 4 For A Period Of Four Months 120 Days On Contract Basis

    Tamil Nadu Newsprint And Papers Limited
    XX 20XX
    Tamil Nadu - Karur
    Refer doc
    0

    Corrigendum : Changing Of Sump Pit Suction Line To Another Compartment In Cbp 2 At Pulp Mill Mechanical In Tnpl Unit-i

    TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
    XX 20XX
    Tamil Nadu - Coimbatore
    Refer doc
    48XXXX

    Corrigendum : Hiring Of Vehicle For The Official Use Of Aee Om Pnp And 2 Subdivisions

    TAMIL NADU GENERATION AND DISTRIBUTION CORPORATION LIMITED
    XX 20XX
    Tamil Nadu - Kanchipuram
    Refer doc
    0

    Corrigendum : Hiring Vehicle Of 1 No. Diesel/petrol Driven Van / Jeep For Official Use Of Assistant Executive Engineer / Mrt / Kanchipuram For A Period Of Three Years

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Chennai
    Refer doc
    0

    Plate Heat Exchanger Pressure Plate (end Plate) For Phe ?? 1a, 1b & 1c

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps -i - Mill Plant - Unit - Iv ?? Dismantling The Eroded 90 Degree Ceralin Coal Bends From Coal Pipe Lines And Reconditioning The Released One And Then Assembling The Reconditioned Bends In An Appropriate Manner In The Coal Flow System During Annual Overhaul 2025 ?? 2026 In Unit ?? Iv.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Chennai
    Refer doc
    0

    350 Nb Seamless Pipes Of Od 355.6 Mm And Ms Coupling Set Suitable For 350nb Seamless Pipe

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps -i ?? Mill Plant - Unit- Iv - Removal Ofaccumulated Ash From The Horizontal Portions Of The Millinlet Hot Air Ducts At 4.5mtr Level & 18mtr Level Andproviding Insulation For P.a Inlet Hot Air Duct To Mill Formills 4a To 4f During Overhaul 2025 - 26.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mettur Tps-i - Mill Plant ?? Unit ?? Iv ?? Coal Flow System To Boiler - Rotating The Existing Eroded Straight Coal Pipes To Boiler Corner -1 To Corner - 4 For 180o Rotating At 16 Meter Level Near Boiler Area., During Annual Overhaul 2025 ?? 26.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-i - Mill Plant- Unit- Iv - Reconditioning The Eroded / Worn Out / Patch Welded Areas Of Mill Outlet Elbow (moe) & Removing The Eroded / Worn Out Portion Of The Released Moe By Gas Cutting And Preparation Of New Coal Pipes / M S Plates To The Required Shape & Size And Positioning The Prepared Portion In The Existing Released Mill Outlet Elbows (moe) And Welding Properly During Annual Overhaul 2025 ??26 In Unit Iv.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps - I - Mill Plant - Unit - Iv - Changing Of Coal Pipe With Collar At Various Location In The Coal Pipe Lines During Annual Overhaul 2025-26

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-i - Mill Plant ?? Unit - Iv ?? Hard Facing Of Vertical Coal Pipe (1mtr Length) After Transition Piece -24nos In Mill 4a To Mill 4f During Annual Overhaul 2025 ?? 26 .

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mettur Tps-i - Mill Plant ?? Unit - Iv?? Coal Flow System To Boiler - Rotating The Existing Eroded Straight Coal Pipes Of Mills 4a, 4b, 4c, 4d, 4e & 4f For 180?? Rotation At 16 Meter Level Above The Mill And Below The 18 Meter Floor And Dismantling, Rectification And Reassembling Of Hanger Support Etc., During Annual Overhaul 2025 ?? 26.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-i - M-i - Ca - Cws-ii - Unit-iv - Complete Dismantling, Inspection, Overhaul Including Renewal Of Worn-out Pump Components & Assembling And Replacement Of Damaged Rubber Expansion Joint Of Cwp 4c Of Stage-ii

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-i ?? Bm ?? Unit-iv - Boiler Pressure Parts - Aoh 2025 ?? Maintenance Of Burners And Replacement Of Worn Out Fasteners At Cover Plates

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-1 -bm-unit Iv- Annual Maintenance-2025-26- Hot Primary Air Ducts& Hot Secondary Air Ducts Of ??a & B? Sides- Cleaning The Accumulated Ash, Arresting The Air Leakage By Rectification Of The Damper And Ducts & Removal Of Accumulated Ash At Interconnection And Around The Secondary Air Duct In Scaph Area And Other Related Works Etc.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps??i ?? Bm ?? Unit-iv - Boiler Pressure Parts - Aoh- 2025 - Cleaning Of Boiler Structures From ??0?? To ??52?? M Level Etc

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-i - Mill Plant ?? Unit - Iv - Dismantling Of Fuel Inlet Elbow (short) & Fuel Inlet Elbows (long) , Renewal Oferoded Fie (short) , Hard Facing Of Released Fuel Inlet Elbows Long& Short And Then Assembling Of Fuel Inlet Elbows Duringannual Overhaul 2025 ?? 26.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-i ??mill Plant - Unit -iv - Applying Two Layers Ceramic Wear Coat Eromat At Mill Outlet Elbows, Ceramic 900 Bends, 75 Deg Ceralin Bends , Ceralin 60 Deg Bends & 45 Deg Ceralin Bends And Multiple Port Outlet Are Released From Unit - Iv During Aoh 2025- 26.

    TAMIL NADU ELECTRICITY BOARD
    XX 20XX
    Tamil Nadu - Mettur
    Refer doc
    0

    Mtps-i- Mill Plant ?? Unit-iv ?? Dismantling, Patch Welding And Assembling Of Mill Outlet Elbows, Orifices, Transition Pieces, Fabrication Of Spool Piece, Multiple Port Outlets Etc. -in Mill 4a To 4f During Aoh-2025-26

    Select a tender