Govt. Tenders
Found 1400 tenders for your search .
15; Supply of Watertight crushproof case along with panel frame mounting arrangement as per Annexure
Read MorePublish Date | 21 Apr 2025 | |
Bid Submission End Date | 09 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 21 Apr 2025 | |
Bid Submission End Date | 09 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
100; BRAKE LINER AL/TP/HLP/B/ 10 11 STD 8 RANE SET OF 4 PC with revets BRAKE LINER AL/TP/HLP/ 3 4 1st over size7 RANE SET OF 4 PC with revets BRAKE LINER AL/TP/HLP/ 3 4 STD 7 RANE SET OF 4 PC with revets Brake liner AL/TP/HLP/B/1011 1st over size8 RANE Set of four pieces with revets
Read MorePublish Date | 21 Apr 2025 | |
Bid Submission End Date | 12 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 21 Apr 2025 | |
Bid Submission End Date | 12 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
20; Level Transmitter Radar Type Q3 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 7 Lakh s MSE Exemption for Turnover/ 34 34 Yes Startup Exemption for Turnover/ 34 34 Yes Document required from seller/ Bidder TurnoverCertificate Requested in ATCOEM Authorization CertificateAdditional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/No ITC available to buyer/ Yes Type of Bid/Two Packet Bid
Read MorePublish Date | 21 Apr 2025 | |
Bid Submission End Date | 12 May 2025 | |
Earnest Amount | 44 K | |
Tender Amount | 25.96 L |
Publish Date | 21 Apr 2025 | |
Bid Submission End Date | 12 May 2025 | |
Earnest Amount | 44 K | |
Tender Amount | 25.96 L |
6; M/s Leak proof make pump
Read MorePublish Date | 21 Apr 2025 | |
Bid Submission End Date | 13 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 21 Apr 2025 | |
Bid Submission End Date | 13 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
1; Digital Radio Fluoroscopy System
Read MorePublish Date | 21 Apr 2025 | |
Bid Submission End Date | 12 May 2025 | |
Earnest Amount | 7.06 L | |
Tender Amount | Refer Doc |
Publish Date | 21 Apr 2025 | |
Bid Submission End Date | 12 May 2025 | |
Earnest Amount | 7.06 L | |
Tender Amount | Refer Doc |
4; Oil Cooler and after coolar without fan fan motor Part No 2740148550/274001950
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | 22 K | |
Tender Amount | Refer Doc |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | 22 K | |
Tender Amount | Refer Doc |
561; Steel Chequered Plates as per IS 3502 Unit - Mass Q3 MS Structural Plate as per IS 2062 Unit - Quantity Q3 Steel Flat as per IS 2062 Q3 MSE Exemption for Years Of Experience/ and Turnover 12 12 Yes Startup Exemption for Years Of Experience/and Turnover12 12 Yes Document required from seller/ Certificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No Type of Bid/Two Packet Bid Primary product category Steel Chequered Plates as per IS 3502 Unit - Mass
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 19 May 2025 | |
Earnest Amount | 17.98 K | |
Tender Amount | Refer Doc |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 19 May 2025 | |
Earnest Amount | 17.98 K | |
Tender Amount | Refer Doc |
4; Online oxygen analyser as per the attached annexure
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Customized AMC/CMC for Pre-owned Products - Electrosurgical Cautery machines Technodyne Annual Maintenance Contract AMC Six-Monthly No Contract Period/ 2 Years Years of Past Experience Required for same/similar service/ /0 /0 3 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Experience CriteriaCertificate Requested in ATCOEM Authorization Certificate In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ Yes
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 09 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 24.08 K |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 09 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | 24.08 K |
2; Fourier Transform Infrared Spectrometer along with accessories
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | 1.56 L | |
Tender Amount | Refer Doc |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | 1.56 L | |
Tender Amount | Refer Doc |
10; 2 ROLLS 5KM EACH OF SMF 28 ULTRA OPTICAL BARE FIBER CABLE
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 15 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Canteen Service - Percentage Model Contract Period/ 2 Years Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 49 Lakh s Years of Past Experience Required for same/similar service/ 45 45 1 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years Of Experience/and Turnover Yes Startup Exemption for Years Of Experience/and Turnover Yes Document required from seller/ Experience CriteriaBidder TurnoverCertificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 08 May 2025 | |
Earnest Amount | 1.97 L | |
Tender Amount | 98.74 L |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 08 May 2025 | |
Earnest Amount | 1.97 L | |
Tender Amount | 98.74 L |
439; Graphite gland packing ropes Expanded graphite gland packing Size: 13X13 SQUARE MM Expanded graphite gland packing Size: 16X16 SQUARE MM Expanded graphite gland packing Size: 22X22 SQUARE MM Expanded graphite gland packing Size: 26X26 SQUARE MM
Read MorePublish Date | 24 Apr 2025 | |
Bid Submission End Date | 16 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 24 Apr 2025 | |
Bid Submission End Date | 16 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
50; High End Desktop Computer Q2 Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 15 Lakh s OEM Average Turnover Last 3 Years/ 3 3 15 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s MSE Exemption for Turnover/ 78 78 Yes Startup Exemption for Turnover/ 78 78 Yes Document required from seller/ Experience CriteriaPast PerformanceBidder TurnoverCertificate Requested in ATCOEM Authorization CertificateOEM Annual TurnoverCompliance of BoQ specification and supporting document In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 20 May 2025 | |
Earnest Amount | 76.7 K | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 20 May 2025 | |
Earnest Amount | 76.7 K | |
Tender Amount | Refer Doc |
DOUBLE TAB WASHER;2000; double tab washer m-10 moc ss 304 thickness 0.8 mm double tab washer m-12 moc ss 304 thickness 1 mm double tab washer m-14 moc ss 304 thickness 1 mm double tab washer m-16 moc ss 304 thickness 1 mm double tab washer m-18 moc ss 304 thickness 1 mm double tab washer m-20 moc ss 304 thickness 1 mm double tab washer m-22 moc ss 304 thickness 1 mm double tab washer m-24 moc ss 304 thickness 1 mm double tab washer m-27 moc ss 304 thickness 1.6 mm double tab washer m-30 moc ss 304 thickness 1.6 mm double tab washer m-33 moc ss 304 thickness 1.6 mm double tab washer m-36 moc ss 304 thickness 1.6 mm
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 10 May 2025 | |
Earnest Amount | 10.4 K | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 10 May 2025 | |
Earnest Amount | 10.4 K | |
Tender Amount | Refer Doc |
3; NON SILICONE THERMAL GREASE MAKE: TIMTRONICS
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 20 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 20 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
2; Supply and installation of controller board of LabTech Chiller model no H150-2100N Supply and installation of touch screen display unit of LabTech Chiller model no H150- 2100N
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 19 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 19 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
9; medical stools or chairs Q3 Modular Table / Meeting Table / Centre Table V2 Q2 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No Type of Bid/Two Packet Bid Primary product category Modular Table / Meeting Table / Centre Table V2 Time allowed for Technical Clarifications during technical evaluation/ 7 Days
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 09 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 09 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Facility Management Services - LumpSum Based - MCMFCG IGCAR Kalpakkam Technical assistance for monitoring and maintenance of A/C and Ventilation plant machineries and equipments on round the clock basis at RCL complex IGCAR Kalpakkam Consumabl.. Contract Period/ 1 Years Minimum Average Annual Turnover of the bidder For 3 Years/ 3 3 35 Lakh s Years of Past Experience Required for same/similar service/ 45 45 3 Year s Past Experience of Similar Services required/ Yes MSE Exemption for Years Of Experience/and Turnover Yes Startup Exemption for Years of Experience and Turnover/ No
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 13 May 2025 | |
Earnest Amount | 1.38 L | |
Tender Amount | 68.92 L |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 13 May 2025 | |
Earnest Amount | 1.38 L | |
Tender Amount | 68.92 L |
4; Online UPS V2 Q2 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Certificate Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No Type of Bid/Two Packet Bid Primary product category Online UPS V2 Time allowed for Technical Clarifications during technical evaluation/ 7 Days
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 13 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 13 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
10; SPARE SAFETY RELIEF VALVES FOR HIGH PRESSURE HEATERS FOR SET PRESSURE -75 KG/SQ. CM G SPARE SAFETY RELIEF VALVES FOR LOW PRESSURE HEATERS FOR SET PRESSURE - 37 KG/SQ. CM G
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 21 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 21 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
1; Computer Printer V2 Q2 OEM Average Turnover Last 3 Years/ 3 3 1 Lakh s Years of Past Experience Required for same/similar service/ 45 45 1 Year s MSE Exemption for Years Of Experience/and Turnover 78 78 Yes Startup Exemption for Years Of Experience/and Turnover78 78 Yes Document required from seller/ Experience CriteriaPast PerformanceCertificate Requested in ATCOEM Annual Turnover In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ Yes
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 20 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 20 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
600; Polyester/Nylon Liner Knitted Gloves Q3 MSE Exemption for Years of Experience and Turnover/ No Startup Exemption for Years of Experience and Turnover/ No Document required from seller/ Additional Doc 1 Requested in ATC In case any bidder is seeking exemption from Experience / Turnover Criteria the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid/ No Bid to RA enabled/ No Type of Bid/Two Packet Bid Time allowed for Technical Clarifications during technical evaluation/ 7 Days Inspection Required By Empanelled Inspection Authority / Agencies pre- registered with GeM No
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 10 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 10 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
20; 10 kVA Step down transformer
Read MorePublish Date | 28 Apr 2025 | |
Bid Submission End Date | 19 May 2025 | |
Earnest Amount | 15.87 K | |
Tender Amount | Refer Doc |
Publish Date | 28 Apr 2025 | |
Bid Submission End Date | 19 May 2025 | |
Earnest Amount | 15.87 K | |
Tender Amount | Refer Doc |
Seamless Carbon Steel Fittings;22691; Radius Bend of Nominal Diameter DN 80ANSI B16.9Sch40 Material ASTM SA 234 Gr WPB. Seamless Butt Welded 30 degree Long Radius Bend of Nominal Diameter DN 100ANSI B16.9Sch40ASTM SA 234 Gr WPB. Seamless Butt Welded 45 degree Long Radius Bend of Nominal Diameter DN 100 ANSI B16.9Sch40ASTM SA 234 Gr WPB. Seamless Butt Welded 60 degree Long Radius Bend of Nominal Diameter DN 100Conforming to dimensional standard ANSI B16.9Sch40ASTM SA 234 Gr WPB. Seamless Butt Welded 90 degree Long Radius Bend of Nominal Diameter DN 100ANSI B16.9 Sch40ASTM SA 234 Gr WPB. Seamless Butt Welded 45 degree Long Radius Bend of Nominal Diameter DN 200ANSI B16.9Sch40ASTM SA 234 Gr WPB. Seamless Butt Welded 90 degree Long Radius Bend of Nominal Diameter DN 200ANSI B16.9Sch40ASTM SA 234 Gr WPB. Seamless Butt Welded 90 degree Long Radius Bend of Nominal Diameter DN 250 ANSI B16.9Sch40ASTM SA 234 Gr WPB. Seamless Butt Welded 30 degree Long Radius Bend of Nominal Diameter DN 25. ANSI B16.9Sch40 ASTM SA 234 Gr WPB . Seamless Butt Welded 60 degree Long Radius Bend of Nominal Diameter DN 25.ANSI B16.9Sch40 ASTM SA 234 Gr WPB Seamless Butt Welded 180 degree Long Radius Bend of Nominal Diameter DN 25ANSI B16.9Sch40 ASME SA 234 Gr WPB . Seamless Butt Welded 60 degree Long Radius Bend of Nominal Diameter DN 65 ASME B16.9Sch40 SA 234 Gr WPB. Seamless Butt Welded 45 degree Long Radius Bend of Nominal Diameter DN 80ASME B16.9Sch40SA234 Gr WPB. Seamless Butt Welded 90 degree Long Radius Bend of Nominal Diameter DN 125ASME B16.9 Sch40SA234 Gr WPB.
Read MorePublish Date | 29 Apr 2025 | |
Bid Submission End Date | 10 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |
Publish Date | 29 Apr 2025 | |
Bid Submission End Date | 10 May 2025 | |
Earnest Amount | Refer Doc | |
Tender Amount | Refer Doc |