Central Railway
Maharashtra | Mumbai |
- Download
Time left to bid
8
Days8
Hours56
MinutesTimeline
Tender Roadmap
Publish Date
02 Aug 2025
Tender is published for seller Participation.
Bid Submission End Date
18 Aug 2025
Last day to participate Tender on Gem platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Supply Of Double Leg Chain Sling Alloy Steel Grade 80 With "o" Ring At The Top And Bottom Hook Openin G Each Leg Capacity 1.5 Ton And Swl Of Assembly Is 2ton, Length Of Eack Leg Is 3 Feet Excluding "o" Ring And Bottom Hook, Link Dia 8 Mm As Per Is:6216 With Load Proof Certificate Issued By Agency/competent Person A Pproved By Directorate Of Industrial Safety And Health [ Warranty Period: 30 Months After The Date Of Deli Very ]
|
||||||||||
My Evaluation Notes | ||||||||||
|