TAMIL NADU ELECTRICITY BOARD
Tamil Nadu | Mettur |
- Download
Time left to bid
9
Days18
Hours27
MinutesTimeline
Tender Roadmap
Publish Date
06 Aug 2025
Tender is published for seller Participation.
Bid Submission End Date
21 Aug 2025
Last day to participate Tender on Gem platform.
Evaluation Date
22 Aug 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
2.9 K | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Excavation - Dismantling Work | ||||||||||
Purchaser Address | ||||||||||
The Superintending Engineer,Electrical Systems, Mettur thermal Power Station,Mettur Dam. | ||||||||||
Work Description | ||||||||||
Mtps-i Es Circle Em-idismantling The Defective Bfp Cooler With Nest Attending The Defect In The Released Bfp Cooler And Re-erection Of The Bfp Cooler With Nest In Bfp Motor For Unit-i To Iv Dismantling The Defective Stator Water Cooler Attending The Defect In The Released Stator Water Cooler And Re-erection Of The Stator Water Cooler In Its Bed For Unit-i To Iv For A Period Of 12 Months From The Date Of Commencement Of Work
|
||||||||||
My Evaluation Notes | ||||||||||
|