INTEGRAL COACH FACTORY
Tamil Nadu | Chennai |
- Download
Time left to bid
17
Days18
Hours21
MinutesTender Roadmap
Publish Date
22 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
20 Aug 2025
Last day to participate Tender on Gem platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Manufacturing Machinery - Machine Supply | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Supply Of Axle Box Housing (finish Machined) To Drg.no.emu/m-0-2-002 ,item-2, Alt"j" Gua Rantee Shall Be As Per Clause 13 Of Rdso Specification No.rdso/2007/cg-08 With Amendme Nt No-1. Special Condition : 1.cnc Vertical Turning/boring Machines Shal Be Used For The Bo Ring Operations Item To Be Packed In Polythen Bags And In Suitable Size Wooden Pallet. 1) All Polythene Bags Shall Be Of Min. 200 Microns Thick , Sealed Water Tight In All Sides. 2) Each Polythene Cover Must Have Identification Label With List Of Items Inside. 3)each Woo Den Box Shall Be Stenciled Or Rigidly Nailed With Identification Label. [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|