PRADHAN MANTRI GRAM SADAK YOJANA
Bihar | Gopalganj |
- Download
Time left to bid
3
Days15
Hours51
MinutesTender Roadmap
Publish Date
11 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
22 Jul 2025
Last day to participate Tender on Gem platform.
Evaluation Date
22 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
18.37 L | ||||||||||
Tender Amount | ||||||||||
9.18 Cr | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Bridge Construction - Bridge Work | ||||||||||
Purchaser Address | ||||||||||
Rural Works Department, Bihar 5th floor, Visvesvaraya Bhawan, Nehru Path, Patna-800015 | ||||||||||
Work Description | ||||||||||
Mgsy/25-26/gopalganj-1 /01 - High Level Bridge Across River On Barai Patti To Niranjana Janewali Path Me Dhawast Screw Pipe Pul Ke Asthan Par New Pul Nirman In Block - Gopalganj , Rwd Division Gopalganj-1 , District - Gopalganj , Bihar, Pile Load Test On Single Vertical Pile In Accordance With Is:2911(part-iv) Including Dynamic Load Test For Its Integrity , Length & Capacity A) Initial And Routine Load Test, Pile Load Test On Single Vertical Pile In Accordance With Is:2911(part-iv) Including Dynamic Load Test For Its Integrity , Length & Capacity A) Initial And Routine Load Test, Pile Load Test On Single Vertical Pile In Accordance With Is:2911(part-iv) Including Dynamic Load Test For Its Integrity , Length & Capacity B) Lateral Load Test, Earth Work In Excavation Of Foundation Of Structures As Per Drawing And Technical Specification, Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleterious Matter, Dressing Of Sides And Bottom And Backfilling With Approved Material. Upto 3.000 M Depth, Providing And Constructing Temporary Island 16 M Diameter. All Complete Job As Per Specifications And Direction Of E/i., Providing Service Road Etc. All Complete Job As Per Specifications And Direction Of E/i., Providing Steel Liner 6 Mm Thick For Piles Including Fabricating And Setting Out As Per Detailed Drawing., Bored Cast-in-situ M35 Grade R.c.c. Pile Excluding Reinforcement Complete As Per Drawing And Technical Specifications And Removal Of Excavated Earth With All Lifts And Lead Upto 1000 M., Dismantling Of Existing Structures Like Culverts, Bridges, Retaining Walls And Other Structure Comprising Of Masonry, Cement Concrete, Wood Work, Steel Work, Including T&p And Scaffolding Wherever Necessary, Sorting The Dismantled Material, Disposal Of Unserviceable Material And Stacking The Serviceable Material With All Lifts And Lead Of 1000 Metres(extra Pile Length).
|
||||||||||
My Evaluation Notes | ||||||||||
|