Central Railway
Maharashtra | Mumbai |
- Download
Time left to bid
14
Days17
Hours50
MinutesTender Roadmap
Publish Date
16 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
12 Aug 2025
Last day to participate Tender on Gem platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Railway Machinery - Railway Ancillaries | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Supply Of One Coach Set Of Ceiling Sheet Assembly Along With Fixing Accessories For Lwac Cn Coaches And As Per Specn.mdts-133, Rev-05 And Mdts-118, Rev-01 And Ltr. No. Md46271, Dt.1 2/11/03.industrial Lock To Drg. No.lw44158, Alt-d, Anx-1 ,lw44318, Alt-c, Anx-1 Consists Of: 1)c Eiling Assembly In Transverse Side To Drg. No. Le44101, Alt- L-anx-1 = 9 Nos. 2)ceiling Assembly In Longitudinal Side (with Emergency Light) To Drg No.le44102, Alt- H With Anx-2 = 2 Nos 3)lo Ngitudinal Ceiling Sheet Assembly To Drg. No. Le44217, Alt- D With Anx-2 = 5 Nos. 4)longitudin Al Ceiling Sheet Assembly To Drg. No. Le44239, Alt- A With Anx-2 = 1 No. 5)longitudinal Ceiling Sheet Assembly To Drg. No. Le44240, Alt- A With Anx-2 = 1 No. 6)middle Ceiling Sheet Assembly To Drg. No. Le44103, Alt-e = 9 Nos. 7)middle Ceiling Sheet Assembly To Drg. No. Le44104, Alt-g = 7 Nos. 8)middle Ceiling Sheet Assembly To Drg. No. Le44241, Alt-a = 1 No. 9)middle Ceiling Sh Eet Assembly To Drg. No. Le44242, Alt-a = 1 No. And Fixing Accessories, Which Consists Of: 1) S Pacer To Drg No. Le 44111, Alt-nil =27 Nos. 2) Support Bracket For Lhb Eog Coaches To Drg N O Lw44225, Alt-nil=54 Nos. 3) Aluminium Profile(for Middle Ceiling Sheet)to Drg No Le44110, A Lt-nil=56 Nos. 4) Set Of Cover Angles For Lwaccn Coaches To Planning List No. Mplcoa3tl, Ve R.0 And As Per Specn. Mdts-133, Rev- 05 And Mdts-118, Rev-01 And Rcf Ltr No. Md 46271 Dt. 12/11 /03 Consists Of : A) Cover Angle-1, Le44191, Alt-nil, Anx-1=18 Nos. B) Cover Angle-2, Le44192, Al T-nil, Anx-1=18 Nos. 5) Aluminium Extrusion To Drg No. Lw 44173, Alt-a, Length 5000-mm =9 No S. 6) Aluminium Extrusion To Drg No. Lw 44114, Alt-c, Length 1950 Mm =9 Nos. [ Warranty Perio D: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|