Rail Coach Factory
Punjab | Kapurthala |
- Download
Time left to bid
19
Days3
Hours29
MinutesTender Roadmap
Publish Date
14 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
18 Aug 2025
Last day to participate Tender on Gem platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Power Conditioning - Inverters | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Corrigendum : Supply Of Static Inverter 25kva For Rmpu (underslung) For Lhb Hybrid Sg Ac Coaches With Control Cable Length Pp&npp=18mts Each, As Per Drawing: Rdso/pe/spec/ac/0024 Rev-" 0" 2001 Am-2. , Packing Instruction: Electrical Panels To Be Protected With Transparent Bio Degradable Polythene Bag/sheets Thickness Of 0.1 Mm Or An Antistatic Bag Of 350 To 400 Gauge (100 Micron Approx.) On All Sides Of Panel & Panel Shall Be Packed In Transport W Orthy Wooden Cage. Bottom Frame To Be Made Of Wooden Planks 20mm Thick & Should H Ave Support Of At Least 3 Wooden Batons Of Size 100x100mm Of Suitable Length To Facili Tate Lifting By Fork Lifter & Secure Properly With Suitable Packing To Avoid In-transit D Amage. Each Panel To Be Packed In Transport Worthy Wooden Cage Of Suitable Dimensio Ns Made Out Of Wooden Strip Of 20x100 Mm Size. Gap Between Each Strips Should Not Be More Then 100mm.a List Should Be Pasted On Each Wooden Cage Showing Order No, Pl No , Description, Drg /spec. No, Qty, Firm' Name & Address, Consignee Name, Date Of Dispatch, Top Bottom Arrow Mark Etc. [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|