PRADHAN MANTRI GRAM SADAK YOJANA
Bihar | Patna |
- Download
Time left to bid
4
Days3
Hours26
MinutesTender Roadmap
Publish Date
15 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
22 Jul 2025
Last day to participate Tender on Gem platform.
Evaluation Date
22 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
7.19 L | ||||||||||
Tender Amount | ||||||||||
3.59 Cr | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Bridge Construction - Bridge Work | ||||||||||
Purchaser Address | ||||||||||
Rural Works Department, Bihar 5th floor, Visvesvaraya Bhawan, Nehru Path, Patna-800015 | ||||||||||
Work Description | ||||||||||
State Scheme (nabard)/25-26/barsoi/01 - Construction Of Hl Rcc Bridge From Ganjan To Vibhor Hat Road At Ch.-1.720km, Earthwork In Excavation For Structures As Per Drawing And Technical Specifications Clause 305.1 Including Setting Out, Construction Of Shoring And Bracing, Removal Of Stumps And Other Deleterious Material And Disposal Upto A Lead Of 50 M, Dressing Of Sides And Bottom And Backfilling In Trenches With Excavated Suitable Material. I) Upto 3m Depth, Providing And Constructing Temporary Island 8 M Diameter For Construction Of Pile Foundation. Assuming Depth Of Water 4.0 M And Height Of Island 4.5 M., Dismantling Of Reinforced Concrete Pile Head Complete As Per Drqwing And Technical Specification, Providing And Laying Of Pcc M15 Levelling Course 150mm Thick Below The Pile Cap. Ii. Pcc Grade M-15 (levelling Course), R.c.c. Grade M 35 In Pile Foundation Complete As Per Dwg & Tech Specification. Pile Cap In Rcc M-35, Bored Cast-in-situ M35 Grade R.c.c. Pile Excluding Reinforcement Complete As Per Drawing And Technical Specifications And Removal Of Excavated Earth With All Lifts And Lead Upto 1000 M. Ii. 1200 Mm Dia, Supplying, Fitting And Placing Hysd Bar Reinforcement In Foundation Complete As Per Drawings And Technical Specifications Clauses 1000 And 1202, Providing Steel Liner 6 Mm Thick As Per Detailed Drawing., R.c.c. Grade M-35 In Substructure Complete As Per Dwg & Tech Specification I) Upto 5m Height (using Concrete Mixer), R.c.c. Grade M-35 In Substructure Complete As Per Dwg & Tech Specification Ii) From 5m Upto 10m Height (using Concrete Mixer), R.c.c.
|
||||||||||
My Evaluation Notes | ||||||||||
|