Department of Defence Research and Development
Maharashtra | Nagpur |
- Download
Time left to bid
0
Days1
Hours40
MinutesTender Roadmap
Publish Date
01 Jul 2025
Tender is published for seller Participation.
Bid Submission End Date
24 Jul 2025
Last day to participate Tender on Gem platform.
Evaluation Date
25 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
50 L | ||||||||||
Tender Amount | ||||||||||
9.8 Cr | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Laboratory Equipments - Laboratory Equipment | ||||||||||
Purchaser Address | ||||||||||
CFEES TIMARPUR DELHI - 110054 | ||||||||||
Work Description | ||||||||||
Establishment Of Integrated Analytical Laboratory For Demil Plant - Hot Air Oven, Magnetic Stirrer, Heating Cooling Circulator, Rotary Evaporator With Chiller And Vacuum Pump, Ultrasonic Cleaner, High Speed Orbital Shaker, Vacuum Pump, Peristaltic Pump, Benchtop Ph Meter With Orp Electrode & Necessary Buffers, Electrode Storage Solution & Electrode Cleaning Solution, Dissolved Oxygen Meter, Turbidity Meter, Bench Top Multi-parameter Tester (conductivity, Tds, Salinity, Ph), Bod Incubator, Cod Digestor System, Vortex Mixer, Effluent Sampling Manifold (esm) With Controlled Cobustion Chamber (ccc), Analytical Balance, Laboratory Balance, Mini Centrifuge Machine, Gyro Shaker, Melting Point Apparatus, Electric Bunsen Burner, Deep Freezer, Laboratory Rrefrigerator, Ultra-pure Water Purification System, Muffle Furnace, Double Distillation Unit, Probe Sonicator, Heating Mantles, Systematic Design, Partitions, Equipment Console With Work And Storage Modules, Chemical Reagent Console With Work And Storage Modules, Instrument Console With Work And Storage Modules, Overhead Storage Console, Extended Office Console, Office Console, File Storage Console, Record Management Console, Back Positioning Module, Fire Protection Modules, Fume Closet, Exhaust Manifold, Power Reserve (40 Kva), Elemental (chnso)analyzer, Inductively Coupled Plasma - Mass Spectrometer (icp-ms), Microwave Digestion System, Amc Cost For 1st Year After Expiry Of Warranty Period, Amc Cost For 2nd Year After Expiry Of Warranty Period, Amc Cost For 3rd Year After Expiry Of Warranty Period
|
||||||||||
My Evaluation Notes | ||||||||||
|