Rail Coach Factory
Punjab | Kapurthala |
- Download
Time left to bid
7
Days17
Hours36
MinutesTender Roadmap
Publish Date
30 Jun 2025
Tender is published for seller Participation.
Bid Submission End Date
04 Aug 2025
Last day to participate Tender on Gem platform.
Evaluation Date
04 Aug 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Design, Supply, Installation, Testing & Commissioning Of Inter Vehicular Couple R (ivc), System For Multiple Unit Operation (mu), Hog Operation, Passenger Communication (e Tb) And Emergency Feed Terminal (eft) For Push Pull Rake On Lhb Platform., As Per Drawing: Ic F Spec No.icf/elec/970 Rev.00 Cs:01 & Cs:02 As Per Annexure-3 For Lslrd Coaches., Packing Instr Uction: Suitably Covered With Biodegradable Transparent Polythene And Packed In Wooden Box.the Material Used For Product Packaging Shall Be Eco-friendly .each Packing Shall Be Stenciled/labeled Handle With Care, Consignee Name, Order No,pl's No , Description Of Item, Batch No, Drg/spec No, Qty,firm's Name, &date Of Despatch Etc. Note- 1) Firms Have Option To Provide Qr Code. For Linkage Of Po, The Cardboard Box Shall Carry A Qr Code Having Detail S As Listed Below: A)nameof The Manufacturer <manuname> B)purchaseorder Number <pon O> C)purchaseorder Date <podt> D)uniqueserial Number (or Lot Number For Bulk Items) Of The Manufacturer <manusno>or <manulno> E)dateof Manufacture <manudate> F)deliver Ychallan No. <delchalno> G)deliverychallan Date <delchaldt> 2.the Qr Code Shall Be As Per Iso/iec 18004 Model2 And The Data Shall Be Available As Xml Using The Tags Detailed Abo Ve. [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|