East Central Railway
Bihar | Gaya |
- Download
Time left to bid
6
Days12
Hours36
MinutesTender Roadmap
Publish Date
26 Jun 2025
Tender is published for seller Participation.
Bid Submission End Date
28 Jul 2025
Last day to participate Tender on Gem platform.
Evaluation Date
28 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Railway Machinery - Railway Ancillaries | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Manufacture And Supply Of 1 In 8.5 Diamond Crossing With Single Slip (curved Switch) Bg For 60 Kg Rails On Psc Sleepers Layout Complete With 7000 Mm Over Riding Curved Switches To Rdso Drg. No. T-6493 Alteration 2/(latest Alteration) And Specification: Irs: T-10-2025 & Cms Acute Crossings To Rdso Dr G. No. T-4967- 02 Nos/latest Alteration, Cms Obtuse Crossings To Rdso Drg. No. T-6495 - 02 Nos/latest Alt Eration And Specification Irs: T-29 (revised 2024), Str Tdg- 0021 Version 2.0 For Cms Crossings With Late St Revision/corrigendum/amendment Complete With All Parts Listed In The Sub Assembly Rdso Drg. No. T-64 93 But Excluding Standard Fish Plates, Fish Bolts, Elastic Rail Clips, Insulating Liners/metal Liners As Amend Ed Up-to Date Of Closing Of E- Tender. List Of Fittings As Per Annexure- B Note:- Rails Needed For Fabrication P Urpose Has To Be Arranged By Supplier At His Own Cost In Terms Of Railway Board's Letter No. 2022/track-1( P)/fabricators Dt. 24.01.2022. [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|