East Central Railway
Bihar | Gaya |
- Download
Time left to bid
13
Days12
Hours33
MinutesTender Roadmap
Publish Date
26 Jun 2025
Tender is published for seller Participation.
Bid Submission End Date
04 Aug 2025
Last day to participate Tender on Gem platform.
Evaluation Date
04 Aug 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Railway Machinery - Railway Ancillaries | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Manufacture And Supply Of 1 In 8.5 Diamond Crossing With Double Slips (curved Switch) Bg F Or 60 Kg Rails On Psc Sleepers Layout Complete With 7000 Mm Over Riding Curved Switches To Rdso Drg. No. T-6494 Alteration 3/(latest Alteration) And Specification: Irs: T-10-2025 And Cms Acute Crossings To R Dso Drg. No. T-4967- 02 Nos/latest Alteration, Cms Obtuse Crossings To Rdso Drg. No. T-6495 - 02 Nos/la Test Alteration And Specification Irs : T-29 (revised 2024),str Tdg-0021 Version 2.0 For Cms Crossings Wit H Latest Revision/corrigendum/amendment Complete With All Parts Listed In The Sub Assembly Rdso Drg. No . T-6494 But Excluding Standard Fish Plates, Fish Bolts, Elastic Rail Clips, Insulating Liners/metal Liners As A Mended Up-to Date Of Closing Of E- Tender. List Of Fittings As Per Annexure-b Note:- Rails Needed For Fabricat Ion Purpose Has To Be Arranged By Supplier At His Own Cost In Terms Of Railway Board's Letter No. 2022/tra Ck-1(p)/fabricators Dt. 24.01.2022. [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|