Indian Railway
Bihar | Gaya |
- Download

Tender Roadmap
Publish Date
28 Jun 2025
Tender is published for seller Participation.
Bid Submission End Date
21 Jul 2025
Last day to participate Tender on Gem platform.
Evaluation Date
21 Jul 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Soft Starter For 3- Phase Induction Motor (90 Kw) 3-phase, 415vac, 50 Hz Ac For Nf Combust Ion & Id Fan Motor With Following Specification:-(i) Adjustments:initial Start Voltage,start Ramp Time, Soft St Op Ramptime, Motor Flccurrent Ramp,current Limit, Motor Trip Class. Soft Stoptime, Excess Starttime, Pha Se Sequence Protection, Auxiliary Relay Protection. (ii) Indications: No Control Power, Starter Ready, Starter Tripped, Motor Not Running, Motor Running At Full Speed, Motor Starting/ Stopping. (iii) Alarms: Power Circuit , Supply Frequency, Communication Problem, Excess Start Time, Motor Overload, Motor Thermistor, Phase I Mbalance, Phase Sequence.(iv) Digital Input Start, Stop, Motor Thermistor Probe. (v) Digital Output: Main C Ontactor Relay, Programmable Relay. (vi) Local Reset. (vii) Control Power Supply: 110 Vac (viii)power Supp Ly 415 Vac, With Installation, Testing, Commissioning, Proper Fitment & Interfacing With Existing System.m Ake-l & T, Crompton Greaves, Hitachi, Abb, Siemens, Schneider Electric, Nord Drive System, Allen Bradley Or Similar. [ Warranty Period: 12 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|