Central Railway
Maharashtra | Mumbai |
- Download
Time left to bid
1
Months11
Days8
Hours8
HoursTender Roadmap
Publish Date
16 May 2025
Tender is published for seller Participation.
Bid Submission End Date
30 Jun 2025
Last day to participate Tender on Gem platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Air Conditioning - Air Conditioner | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Supply Of Roof Mounted Ac Package Unit (rmpu) & Control Unit For Air Conditioned Ac Emu Ra Kes. One Coach Set Of Rmpu & Control Unit Consisting Of 1) 2 Nos. Of Rmpu Complete , Generally Confirming T O But Not Limited To Rdso/pe/spec/ac/ D/0168-2012, Rev.(0) Including Complete Accessories As Per Clause 2.2 And 2) 1 No. Microprocessor Controller , Generally Confirming To But Not Limited To Rdso/pe/spec/ac/ 01 39-2009 (rev.1) Without Display Unit 3) The Tenderer May Follow The Oga Drawing No. Icf/sk3-7-6-040 Alt.b Of Rmpu General Guidance 4) The Tenderer May Follow The Oga Drawing No. Icf/sk3-7-5-026 Col. I&ii For Con Trol Panel Of Rmpu For Tc And Dmc/ndmc Respectively For General Guidance. 5)coordination With Propulsion System Supplier For Interface ( Physical Layout, Communication Protocol & Algorithm) With Tcms & Power Su Pply System Will Be The Responsibility Of Successful Bidder.( Scope Of Supply: 2 Nos. Of Rmpu And 1 No. Of Mi Croprocessor Controller Unit Per Coach Set) . [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|