Rail Coach Factory
Punjab | Kapurthala |
- Download
Time left to bid
1
Months20
Days21
Hours21
HoursTimeline
Tender Roadmap
Publish Date
01 May 2025
Tender is published for seller Participation.
Bid Submission End Date
15 Jul 2025
Last day to participate Tender on Gem platform.
Evaluation Date
Technical committe will evaluate Bid and Open Results.
Earnest Amount | ||||||||||
Refer Doc | ||||||||||
Tender Amount | ||||||||||
0 K | ||||||||||
Department | ||||||||||
Item Category | ||||||||||
Purchaser Address | ||||||||||
Work Description | ||||||||||
Supply Of Aluminium Pipe 71mmx3.15mm In Length Of 5400mm., As Per Drawing: Din En 755 (p Art 1 , 3) Almg1sio.8 / Din 1795 And Is:2673-1979, Packing Instruction: As Per Standard Packing. I T Should Be Ensured That Item Should Not Rub During Transportation. The Item Should Be Packed With Adequate Strength. Transit Damage , If Any , Shall Be At The Cost Of Supp Lier. [ Warranty Period: 30 Months After The Date Of Delivery ]
|
||||||||||
My Evaluation Notes | ||||||||||
|