Indian Army
Andhra Pradesh | Visakhapatnam |
- Download
Time left to bid
8
Days8
Hours46
MinutesTender Roadmap
Publish Date
07 May 2025
Tender is published for seller Participation.
Bid Submission End Date
28 May 2025
Last day to participate Tender on Gem platform.
Evaluation Date
28 May 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Military Affairs | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
Mobilization of Rotary boring Rig alongwith all accessories to site for soil investigation and to location of boreholes and for in situ tests P14 TPW Boring holes 150mm dia in any type of soil including weathered rock soft disintigrated rock and soft rock but excluding hard rock Boring holes 150mm dia in any type of weak soil to adepth between 15 meters to 30 meters Drilling holes in hard rock fracture rock using hydralic drilling machine within Conduction of following laboratory test on soil samples collected as per Conducting of following laboratory tests on rock samples core collected from bore holes as per relevent Carring out chemical analysis for ground water sample collected at bottom of bore hole Carring out chemical analysis for sub soil for all changing propile of soil samples that has been collected Submisson of reports consisting of bore logs Provision of expertise Architectrual Consultancy for As As and to Bldg NO P 14 TPW AFLOAT office Provision of expertise Structrual Consultancy for submission of Detailed Project Report duly vetted by IIT The consultant sheel carryout modifications review if required by the dept | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
Visakhapatnam | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
BOQ BID;1229; Mobilization of Rotary boring Rig alongwith all accessories to site for soil investigation and to location of boreholes and for in situ tests P14 TPW Boring holes 150mm dia in any type of soil including weathered rock soft disintigrated rock and soft rock but excluding hard rock Boring holes 150mm dia in any type of weak soil to adepth between 15 meters to 30 meters Drilling holes in hard rock fracture rock using hydralic drilling machine within Conduction of following laboratory test on soil samples collected as per Conducting of following laboratory tests on rock samples core collected from bore holes as per relevent Carring out chemical analysis for ground water sample collected at bottom of bore hole Carring out chemical analysis for sub soil for all changing propile of soil samples that has been collected Submisson of reports consisting of bore logs Provision of expertise Architectrual Consultancy for As As and to Bldg NO P 14 TPW AFLOAT office Provision of expertise Structrual Consultancy for submission of Detailed Project Report duly vetted by IIT The consultant sheel carryout modifications review if required by the dept
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|