Nuclear Power Corporation Of India Limited
Karnataka | Uttara Kannada |
- Download
Time left to bid
22
Days10
Hours9
MinutesTender Roadmap
Publish Date
05 May 2025
Tender is published for seller Participation.
Bid Submission End Date
29 May 2025
Last day to participate Tender on Gem platform.
Evaluation Date
29 May 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
9.27 L | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Atomic Energy | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
ECVME-8260 Power PC boards Rugged-COM Make 24 port Ethernet Switches CAT-6 Cable 24 port UTP Patch panel RJ 45 Ports lock UTP patch cords of 1M length UTP patch cords of 2M length UTP patch cords of 10M length Patch guard for UTP patch cords Spike busters Horizontal Cable manager EPROMS 19 inch Rack mount Industrial PC with monitor and keyboard VME mother board Climatic test on ECVME-8260 card Modification of relavant drawings NSR PLC network SR PLC network Single cabinet Operator information console UTP patch cords of 5M length | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
581400,Plant Site, Kaiga Generating Station, PO: Kaiga | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
PLC Upgradation;1473; ECVME-8260 Power PC boards Rugged-COM Make 24 port Ethernet Switches CAT-6 Cable 24 port UTP Patch panel RJ 45 Ports lock UTP patch cords of 1M length UTP patch cords of 2M length UTP patch cords of 10M length Patch guard for UTP patch cords Spike busters Horizontal Cable manager EPROMS 19 inch Rack mount Industrial PC with monitor and keyboard VME mother board Climatic test on ECVME-8260 card Modification of relavant drawings NSR PLC network SR PLC network Single cabinet Operator information console UTP patch cords of 5M length
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|