Bharat Heavy Electricals Limited bhel
Tamil Nadu | Tiruchirappalli |
- Download
Time left to bid
4
Days12
Hours5
MinutesTimeline
Tender Roadmap
Publish Date
03 May 2025
Tender is published for seller Participation.
Bid Submission End Date
19 May 2025
Last day to participate Tender on Gem platform.
Evaluation Date
19 May 2025
Technical committe will evaluate Bid and Open Results.
Earnest Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Tender Amount | |||||||||||||||||||||||||||||
Refer Doc | |||||||||||||||||||||||||||||
Department | |||||||||||||||||||||||||||||
Department Of Heavy Industry | |||||||||||||||||||||||||||||
Item Category | |||||||||||||||||||||||||||||
110 KW/ 150 HP KSB make Horizontal Centrifugal Back Pull- out pump with motor 75 KW/ 100 HP KSB make Horizontal Centrifugal Back Pull-out pump with motor | |||||||||||||||||||||||||||||
Purchaser Address | |||||||||||||||||||||||||||||
620014,MATERIALS MANAGEMENT, IV FLOOR, BUILDING 24, HIGH PRESSURE BOILER PLANT, BHARAT HEAVY ELECTRICALS LIMITED, TIRUCHIRAPPALLI 14 | |||||||||||||||||||||||||||||
Work Description | |||||||||||||||||||||||||||||
2; 110 KW/ 150 HP KSB make Horizontal Centrifugal Back Pull- out pump with motor 75 KW/ 100 HP KSB make Horizontal Centrifugal Back Pull-out pump with motor
|
|||||||||||||||||||||||||||||
Eligibility | |||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||
My Evaluation Notes | |||||||||||||||||||||||||||||
|